Project name : Satellite assembly centre
Country : Egypt
Location: The Administrative Capital.
Data : 2019
Satellite assembly centre
Project Details

Project Description
Ground floor :
- It consists of specialized clean rooms for assembly and testing of satellites, with a purity of ISO 8.
- Administrative part - fire alarm system room - operation and maintenance room - chiller pump room - fire pump room - air compressor room - air handling units (AHU) rooms - UPS room - MDB room - in addition to a separate part of the transformer building.
First floor :
- (administrative offices - laboratories - meeting room - technical control room).
The middle surface :
- imade up of a group of industrial chillers specialized in testing.
The upper deck :
- consists of (2) chillers - smoke exhaust fan - compensation fan.suction fans.
Scope of work
DESIGN AND CONSTRUCTION SUPERVISION OF THE FOLLOWING :
- Power and lighting works.
- Light current works.
- Anti-Intrusion System.
- Building Control System (BMS) works.
- Fire Alarm System and Early Fire Detection (Vesda).
- Ground system and lightning rods.
- Clean room monitoring system (temperature, humidity, and purity).
- The internal network system for tests (checkout test).