Project Details

Project name : Satellite assembly centre
Country : Egypt
Location: The Administrative Capital.
Data : 2019

Project Description

Ground floor :

  1. It consists of specialized clean rooms for assembly and testing of satellites, with a purity of ISO 8. 
  2. Administrative part - fire alarm system room - operation and maintenance room - chiller pump room - fire pump room - air compressor room - air handling units (AHU) rooms - UPS room - MDB room - in addition to a separate part of the transformer building.

First floor :

  • (administrative offices - laboratories - meeting room - technical control room).

The middle surface :

  • imade up of a group of industrial chillers specialized in testing.

The upper deck :

  • consists of (2) chillers - smoke exhaust fan - compensation fan.suction fans.

Scope of work

DESIGN AND CONSTRUCTION SUPERVISION OF THE FOLLOWING :

  • Power and lighting works.
  • Light current works.
  • Anti-Intrusion System.
  • Building Control System (BMS) works.
  • Fire Alarm System and Early Fire Detection (Vesda).
  • Ground system and lightning rods.
  • Clean room monitoring system (temperature, humidity, and purity).
  • The internal network system for tests (checkout test).