Project Details

Project name : Haya karima Assiut
Country : Egypt
Location : Assiut
Owner : wady El Nile
Data : 2020
Total cost : 450 million E.G.P

Project Description

It consists of 6 local units :

  1. Basra – Bani Zaid alakrad – Arab mutair.
  2. Bani Mur – Alfima – Wasti.

Scope of work

Supervision of the implementation :

  1. Replacement and renewal of medium and low voltage networks.
  2. Changing all suspended transformers inside the residential block to transformers inside kiosks.
  3. Connecting all transformer kiosks to each other with medium voltage cables from two different sources.
  4. Connecting the medium voltage over head lines to each other in asound technical way and managing alternative sources in the event of any emergency malfunctions.
  5. Rmoving over head lines inside residential blocks to ground cables to secure the lives of citizens.