An overview of the historical development of the Scientific Bureau of Electromechanical Engineering
1996-1998
1998- 2006
2006 - 2010
The office undertakes electrical engineering consultations for many Ministry of Health and Population hospital projects
Number of engineers (15)
The office moved to Nozha headquarters in Heliopolis
2010- 2014
2014- 2020
Jumia Building - Northern 90th
Number of engineers (25).
The office took over many major projects in the field of improving field irrigation (financed by the World Bank), and the development of many branches of the National Bank of Egypt - taking over the work of the largest project for fish farms in eastern Port Said. The office also participated in studying the problem of complete darkness in the national radio and television building of Egypt in Maspero, developing technical solutions and supervising implementation. In addition to many hospitals affiliated with the Ministry of Health and Population.
2020 - Until now
The office is registered as a multi-disciplinary engineering consulting office in the Engineers Syndicate of Egypt, No. (709)
In the name of the Scientific Office for Electromechanical Engineering (Electrical Energy Transmission and Distribution - Power Engineering and Stations “Air Conditioning and Refrigeration”)
Number of engineers (50).
The office designed and supervised the implementation of many national projects, residential city networks, and agricultural land networks (the South Valley Development Project to reclaim 375 thousand acres in Toshki, south of Egypt) in cooperation with the armed forces Engineering Authority, as well as medical cities at Ain Shams University, and the Nasser Institute, the new campus of Ain Shams University in the Administrative Capital, and the campus of Misr University of Science, and Technology (MUST) in October and Luxor cities, in addition to a number of hospitals and other projects.