About our office

Message

The office provides electrical and mechanical designs for projects within the framework of achieving the highest rates of safety and security for people and tasks, taking into account indicators of reliability of electrical systems, energy saving elements, and uses of new and renewable energy, provided that this is done within the framework of an economical cost without affecting the elements of safety, reliability, and quality, and the application of local and international rules and codes.

Vision

The office aims to be on the list of distinguished people in electrical and mechanical designs for facilities and networks locally and regionally.

Objectives

The office's objectives can be summarized as follows:

  • Preparing electrical and mechanical designs for modern buildings and designing electrical and mechanical networks for cities and residential, industrial, commercial and tourist complexes, as well as their development and expansion.
  • Applying the international code and local rules to all designs.
  • Follow up and apply modern technology in designs that guarantee the highest rates of safety, reliability and quality while saving energy.
  • Preparing designs in an economical manner that does not affect the level of quality of service provided.
  • Coordination with other offices related to projects to avoid any conflict in the design
  • Estimating the importance of the time element in preparing designs so that it does not affect the project completion period.

Resources

  • The office is located in a well-known area in the One Kattameya area, which is easily accessible.
  • The office includes many experiences that participated in major projects.
  • The office has a library of international references and codes.
  • The office relies on an electronic library that contains many original copies of programs that assist in design.

Quality

  • Designs are prepared in the office within the framework of applying quality standards that depend on many stages of technical review to ensure quality and coordination with other systems, and include the following stages: [Peer review - Senior engineer review - Technical director review] .
  • Implementation is also supervised according to the site’s quality models [Quality Assurance, Construction Supervision Manual] to ensure the smooth progress of work, keeping up with schedules, and defining responsibilities.

Economics of design and value engineering

  • In preparing designs, the office relies on studying many alternatives and comparing them technically and economically before preparing the final design of the project to ensure the provision of the required services at the lowest possible cost without affecting the quality and safety elements.
  • In this regard, the office also reviews designs previously prepared by other parties with the aim of reducing costs without affecting the level of service.